

B & H Engineering, P.C has performed the 1998 Biennial Inspection at 18 ramps and bridges located in the Terminal Buildings of JFK Airport for the Port Authority of New York and New Jersey.
This assignment covered the inspection of 18 bridge structures; the Load Ratings, Level 1 and Level 2; updating the bridge inventory for each structure; preparation of Inspection and Project Final Reports; quality control review of reports and inspection documentation; notification and report preparation of flagged conditions; creation of BIN Folder and Inventory for new ramps; planning and scheduling inspection; coordinating inspection with Port Authority personnel and Terminal occupants; planning and requesting lane closures; procuring access equipment necessary for inspection; and providing and monitoring maintenance and protection of traffic.
The Inspection Report included the following: Condition Summary, Inspection Findings and Photographs, Updating Plans, Summary of Major Deficiencies, Primary Member Ratings, and Details or Situation Requiring Special Attention During Inspection; Flag reports; CADD Drafting Using Autocad 12. Also included is the creation of a CD-ROM containing the Inspection Report.
|